Aviation

CSMIA to Conduct Comprehensive Annual Post-Monsoon Runway Maintenance to Ensure Safe Airside Operations

CSMIA

On 20 November 2025, from 1100 hrs to 1700 hrs both runways will be temporarily non-operational owing to scheduled post-monsoon maintenance

Coordination with airlines and other stakeholders initiated six months in advance to ensure flight schedules and manpower planning are synchronised

Mumbai International Airport Limited maintains the highest standard of air travel safety and security at CSMIA

Mumbai International Airport Limited (MIAL), operator of the Chhatrapati Shivaji Maharaj International Airport (CSMIA) – one of the world’s busiest single-runway airports, continues its commitment to maintaining safe, secure and efficient operations. As a part of a comprehensive, annual post-monsoon maintenance plan, both cross runways – RWY 09/27 and RWY 14/32 – will remain temporarily non-operational on 20 November 2025 from 1100 hrs to 1700 hrs IST.

The scheduled closure is designed to ensure continued safety, reliability and compliance with global aviation standards. A Notice to Airmen (NOTAM) was issued in advance, allowing airlines and other stakeholders to adjust flight schedules and manpower planning accordingly. This proactive communication enables seamless coordination across operations and minimises passenger inconvenience.

CSMIA
CSMIA

The maintenance will include detailed inspections, surface repairs, and technical assessments of runway lighting, markings, and drainage systems. The post-monsoon maintenance forms an integral part of CSMIA’s year-round operational readiness programme reinforcing its ‘safety-first’ approach.

Related posts

Adani Airport Holdings Ltd. and Akasa Air Partner to Power NMIA Take-off

admin

Adani Airport Holdings, IHG Hotels & Resorts Sign Five -Hotel Deal; Kimpton Enters India

admin

Malaysia Aviation Group Cuts Over 103,000 Tonnes of CO₂ Emissions Through Operational Efficiency and Fleet Modernisation

admin

Leave a Comment